Wednesday, July 8, 2015

Upper Patio Railing Completed!

I finally made some time to get the railing done on the upper portion of the front patio.  In the following picture, you can see the railing is coming together.


The posts at each end are poured first.  Then the bottom rail is poured, and while the concrete is still wet,  the balusters are set in place (they each have a rod of rebar running through the center to tie them to the upper and lower rails).  In the picture above you can see the tops of the rebar poking out of each baluster and the rebar that has been welded in place to tie all of the balusters together with the end posts and reinforce the top rail section.

I then form up the top rail section with pvc raingutter cut to fit around each baluster and pour concrete again.  Here is the finished result from the outside of the patio.